+ 65 6702 3526

enquiry@newsciencetechs.com

Solution engineered for A Greener and Safer World. 

ISHA Foundation Studios 3,

Tennessee USA

img27

SITE DETAILS

COUNTRYUSA
SITETennessee Institute of Inner Sciences
YEAR2024
KEY ISSUESwaterproofing with minimal disruption to retreat operations.

The Isha Institute of Inner Sciences is a breathtaking mountain retreat, created to build a foundation of complete well-being. The center offers the essence of yogic science in its purest form. Guests journey from around the globe to visit this unique destination to relax, reflect, and reconnect with nature in a tranquil oasis nestled in Tennessee.

CMA100 was chosen for the waterproofing of Studios 3 Building, for its super-fast and ultra-simple application, that does not disturb the function of the areasit is applied on, as well as for its environmentally friendly formula, that respects the natural ecosystems.

Suntrust Amadea, Philippines

PROJECT DETAILS

COUNTRYPhilippines
SITESuntrust Amadea
YEAR2024
KEY ISSUESWaterproofing of rooftop decks.

The twin towers of Suntrust Amadea boast 1315 units of modern contemporary construction.

CMA100 was chosen for the waterproofing of the rooftop decks, for its super-fast, single-coat application, that requires no maintenance or re-application in future

Property developers particularly enjoy using CMA100, as it lowers the cost of construction and future cost of use of any project.

Lifetime, problem-free concrete waterproofing.

Great Valley Medical Center,
Quezon City, Philippines

PROJECT DETAILS

COUNTRYPhilippines
SITEGVMC, Don A. Roces Ave.Quezon City
YEAR2023-24
KEY ISSUES Integral waterproofing of underground structure, retaining walls and roofdecks.

22 levels Hospital, of which 6 basements, and a 407 bed capacity, and a total surface of 85.000m2

CMA Admix is used for Integral waterproofing from basement, retaining walls to roofdeck, while CMA100 is considered for the roofdecks, balconies and exposed areas.

Visayas Ave Medical Center,
Visayas, Philippines

PROJECT DETAILS

COUNTRYPhilippines
SITEVAMC, Quezon City
YEAR2023-24
KEY ISSUESComprehensive waterproofing from foundations to rooftop.

The 8 Storey Hospital with 200 bed capacity, including specialty centers for cancer, heart, kidney, and infertility institute, trusts both CWS Admix and CMA100, for the comprehensive waterproofing of the building, from the foundations, right up to the rooftop.

The performance of CMA waterproofing technology protects the investment made on this large healthcare unit, ensuring uninterrupted operation, with no need for reapplication.

Lifetime, problem-free concrete waterproofing.

Logan Heritage Building, Penang, Malaysia

PROJECT DETAILS

COUNTRYMalaysia
SITELogan Heritage Building
YEAR2022
KEY ISSUESRepeated failure of traditional waterproofing

139 years since its completion in 1883, the Logan Heritage Building within George Town's UNESCO World Heritage Site, was recently restored to its original glory. Owned by Singaporean OCBC Corp., the beautiful Victorian-style complex,servestoday as a retail arcade, with several retail outlets, restaurants, and leisure-time amenities.

After the completion of refurbishment operations, leaking was discovered in several areas. The client tried several methods, including polyurethane and cementitious interventions, which failed to solve the problem and was looking for a long-term solution.

CMA100 was applied, effectively sealing all leaks and cracks on the surface, without the need for a protective screed

Keck Seng Tower, Singapore

PROJECT DETAILS

COUNTRYSingapore
SITEKeck Seng Tower Building
YEAR 2025
KEY ISSUESCar Park Seepage (Leakage Tenant Units)

This business building had seepage issues leading to leakage to their tenant. They had tried several methods and other waterproofing products; it was not sustainable to the extend the maintenance team unable to carry out any washing. The car park had not been washed for several years. When it rains, the tenant experiences the leakage and gypsum ceiling board stained with water seepage and falling of the board. Further more other application needed longer time to close the carpark,

CMA100® was applied, followed by Maxjoint® Elastic Express effectively sealing all leaks and cracks on the surface without the need for a protective screed. The application took total of 7 days.