Solution engineered for A Greener and Safer World. 

Weissen Factory, Rawang, Selangor, Malaysia

PROJECT DETAILS

COUNTRYMalaysia
SITEPet food production plant
YEAR2021
KEY ISSUESReplace failing membrane and achieve permanent waterproofing

This pet food production plant in Malaysia, consists of a three - storey office & showroom building, as well as a nine - storey facility, for production and packing, which is attached to a covered warehouse at the side.

The project was already delayed by several months, so speed of application was critical to the factory. Also, the fact that CMA100 does not need a screed for protection, was important to the client and, finally, the impact to the site was minimal, as the lifting of the usual materials at the 9 floor, would require significant overhead costs, needing cranes and pumps to be set up.

CMA100 was chosen because it is easier to apply and cheaper to complete the project in time, as it does not need a protective screed, has super-fast application and offers a significantly lower total cost of installation.

VW Warehouse, Johore Bahru, Malaysia

PROJECT DETAILS

COUNTRYMalaysia
SITEVW Warehouse
YEAR2019
KEY ISSUES Speed of application

The Volkswagen Group announced that it was moving its Asia-Pacific regional aftersales centre from Singapore to Malaysia. The new hub in Johor Bahru opened its doors in 2018. They needed a product which could keep up with the strenuous time schedule before they opened their doors.

Application of CMA100™ is extremely fast. One person can apply about 6000m2 per day compared to under 100m2 for membranes.

CMA100™also has no loss of slip resistance so it is perfect for driving vehicles on.

Car Park over TNB power room, Malaysia

PROJECT DETAILS

COUNTRYMalaysia
SITEThe Omnia Club Bali
YEAR2022
KEY ISSUESCrack treatment, lifetime waterproofing, protection against abrasion

This condominium, houses a TNB electric power room at the ground floor and a car park on the 1 st floor. Several cracks had appeared on the new construction and the owner was worried for watertightness and also protection of the concrete against wear from vehicles moving and swerving

CMA100 was chosen for three reasons.

• 2.2mm crack sealing ability
• Long-term waterproofing
• Concrete protection, as it hardens the concrete harder than granite, protecting it from mechanical abrasion and wear.